No | Project | Project Owners | Client | Contract Number | Year | Remarks |
---|---|---|---|---|---|---|
1 | Provision for Thermal Insulation Work for Rantau Dedap Geothermal Power Project | PT Supreme Energy Rantau Dedap | PT Supreme Energy Rantau Dedap | 24000099-OS-10103 | 2024 – Now | Project on going |
2 | Blawan Ijen Geothermal Unit #1 Power Plant Project | PT. Medco Cahaya Geothermal (MCG) | PT Inti Karya Persada Tehnik (IKPT) | IJN-CPL-CNT-Aw-4601 | 2024 – Now | Project on going |
3 | Akatara Gas Processing Facilities and Sales Pipeline Project | Jadestone Energy (Lemang) Pvt. Ltd. | PT JGC Indonesia | SC-0825-3190-001 | 2023 – Now | Project on going |
4 | Acid Area – AIM Project Morowali | PT Merdeka Tsingshan Indonesia | PT Merdeka Tsingshan Indonesia | MTI : 003/MTI/SRVC/II/2023 | 2022-2024 | Completed |
5 | Insulation Work for Pipe 24” – BHR-3317-T5 (Geothermal Brine Line) | PT. STAR ENERGY Geothermal – Salak | PT. Gearindo Tiga Utama | 293/GTU-TPEC/PO/II/2022 | 2022 | Completed |
6 | Supply Material Insulation For LOMBOK CFSPP FTP-2 (2×50 MW) Project | PT. PLN | PT Rekayasa Industri | LPP-00-GO-CT-056-R | 2021-2022 | Completed |
7 | Insulation Work for LOMBOK CFSPP FTP-2 (2×50 MW) Project | PT. PLN | PT Rekayasa Industri | LPP-00-GO-CT-057-R | 2021-2022 | Completed |
8 | Painting Work for PLTU Cirebon.2 -1x1000MW Project | PT. Cirebon Power – Cirebon | PT. Wasa Mitra Engineering | 012/WME/KONTRK/PROC/XII/2020 | 2020-2021 | Completed |
9 | Supply Material of Insulation and Installation for Acrylic Acid (AA) Tank-Project | PT. Chandra Asri Petrochemical – Cilegon | PT JGC Indonesia | SC-0792-3190-001 | 2020-2021 | Completed |
10 | Insulation Work for Muara Laboh Geothermal Power Project | PT Supreme Energy Muara Laboh | PT Rekayasa Industri | ML-REK-SCM-CCTA-06-042R | 2020 | Completed |
11 | Supply Material of Insulation for Muara Laboh Geothermal Power Project | PT Supreme Energy Muara Laboh | PT Rekayasa Industri | PO ML-REK-SCM-CPOR-06-111R | 2020-2020 | Completed |
12 | Insulation Work for Spinbath | PT Riau Andalan Pulp and Paper (RAPP) | PT Indokarya Bangun Bersama | P1201_ON-PP4050 rev 0 | 2018 | Completed |
13 | Insulation Work for Pipe Bridge | PT Riau Andalan Pulp and Paper (RAPP) | PT Indokarya Bangun Bersama | P1201_ON-PP3931 rev 1 | 2018 | Completed |
14 | Insulation Work for Viscose and CS2 Recovery Area | PT Riau Andalan Pulp and Paper (RAPP) | PT Indokarya Bangun Bersama | P1201_ON-PP3795 rev 0 | 2018 | Completed |
15 | Installation Refractory & Dryout work for CFB Boiler 1 & 2 Cap 300 TPH | Ashimas Chemical | Formosa Heavy Industries Set Linings Hotwork International | Service Agreement | 2017-2018 | Completed |
16 | nsulation and Refractory Dryout of Power Boiler Cyclone Area Unit 3 & 4 | PT. Indonesia Power Unit Tarahan, Lampung | PT. Vinnydo Putra Utama | 012/VPU/VIII/2017 | 2017 | Completed |
17 | Installation Insulation Work – Karaha Bodas Geothermal Power Plant for PT. PGE (Additional Cladding Repair Work) | PT. Pertamina Geothermal Energy | General Electric Renewable Energy | PO 4101450082#4 | 2017-2018 | Completed |
18 | Installation Insulation Work – Karaha Bodas Geothermal Power Plant for PT. PGE (KRH 6-4, Cluster 4) | PT. Pertamina Geothermal Energy | General Electric Renewable Energy | PO 4101450082#3 | 2017-2018 | Completed |
19 | Installation Insulation Work – Karaha Bodas Geothermal Power Plant for PT. PGE (GPP Area) | PT. Pertamina Geothermal Energy | General Electric Renewable Energy | PO 4101450082#2 | 2017-2018 | Completed |
20 | Installation Insulation Work – Karaha Geothermal Power Plant for PT. PGE (TLG 3-6, Cluster 3, Cluster 6) | PT. Pertamina Geothermal Energy | General Electric Renewable Energy | PO 4101450082#1 | 2017-2018 | Completed |
21 | Installation Insulation Work – Karaha Bodas Geothermal Power Plant for PT. PGE (KRH 4-5, Cluster 4, Cluster 5) | PT. Pertamina Geothermal Energy | General Electric Renewable Energy | PO 4101450082 | 2017-2018 | Completed |
22 | Supply & Install Roofing & Siding Sumpal Compression Project | ConocoPhilips | PT. Rekayasa Industri | SPC-CIV-JOR-016 | 2016 | Completed |
23 | Supply & Install Roofing & Siding Sumpal Compression Project | ConocoPhilips | PT. Rekayasa Industri | C-84541-SU-BBO-CNT-GN-BO-00282016 | 2016 | Completed |
24 | Supply Material Scaffolding | ConocoPhilips | PT. Rekayasa Industri | C-84541-SU-MMO-RPO-GN-00-0122 | 2016 | Completed |
25 | PLTU 2 x 300 MW CFSPP Project | PT. PLN | Chengda Eng Corp. | PO 912112008 | 2008 | Completed |